Project description |
Type of work, stage |
Client |
1 |
Preparing an expert opinion and participation in the court hearings on the case «Construction of Marine Structures in the Sea Port of Sochi» |
Expert examination |
LLC Inzhtransstroy Corporation» |
2 |
Mathematical simulation of hydrometeorological and lithodynamic processes during the construction and operation of water supply structures of NPP Kudanculam |
Design documentation |
OJSC Hydroproject Institute |
3 |
FEED documentation, calculations and preparation of cost estimates to arrive at a price for a pier at the port terminal handing general cargo and fertilizers. Merchant Sea Port Ust-Luga: Terminal for General Cargo and Fertilizers (ULTK). |
FEED documentation |
LLC Baltic Fertilizers Terminal (represented by CJSC Investment Construction Management) |
4 |
Optimization of technological and layout design for location of marine structures (a cargo pier and a harbor craft quay) for the project «A 20.0 MTA Coal Terminal Vicinity the Cape Otkryty - Port Vera» |
Design documentation |
CJSC ROSENGINEERING |
5 |
Physical simulation of wave loads on marine structures of the project «A 20.0 MTA Coal Terminal vicinity the Cape Otkryty - Port Vera» |
Design documentation |
CJSC ROSENGINEERING |
6 |
Mathematical simulation of wind impact on a temporary coal storage under the project «A 20.0 MTA Coal Terminal Vicinity the Cape Otkryty - Port Vera» |
Design documentation |
CJSC ROSENGINEERING |
7 |
Section «Field Studies» as part of engineering-hydrometeorological survey of the project «A 20.0 MTA Coal Terminal Vicinity the Cape Otkryty - Port Vera» |
Engineering survey |
CJSC ROSENGINEERING |
8 |
Ветрозащитные барьеры склада временного хранения угля в составе объекта «A 20.0 MTA Coal Terminal vicinity the Cape Otkryty - Port Vera» |
Design documentation |
CJSC ROSENGINEERING |
9 |
Market study, predictive analysis and development of the General Layout for the Bigger Port of Vera |
FEED documentation |
CJSC ROSENGINEERING |
10 |
Making adjustments in the design documentation of the project "Construction of Berthing Facilities of a Remote Terminal of the Port of Vysotks, Cape Putevoi" |
Design documentation |